Displaying report 1-1 of 1.
Reports until 00:11, Wednesday 25 July 2018
H1 AOS
craig.cahillane@LIGO.ORG - posted 00:11, Wednesday 25 July 2018 (43055)
PRMI Buildups slightly improved by returning to June 21 alignment
Craig, Jenne, Sheila

Tonight we hoped to increase PRMI buildups by going back to the June 21st 2018 10:00:00 UTC alignment using the top mass witness channels.  This sort of worked, as our buildups are now 20% better (POPAIR_B_RF18_NORM = 7, POPAIR_B_RF90_NORM = 19), but we did not achieve the power levels we had then (POPAIR_B_RF18_NORM = 27.5, POPAIR_B_RF90_NORM = 40.75): our sideband buildups are one fourth as high.  
All June/July locking power pales in comparison to Sheila's May PRMI/DRMI lock, something is still seriously wrong.

Sheila walked the beam using PR2_SPOT_MOVE to minimize scattering on the PR2 camera, then optimized buildups from there.  
Sheila and I doubled checked POPAIR_B and everything seems to be in order.  
Maybe it is time to double-check our 9 and 45 MHz modulation depths.
Displaying report 1-1 of 1.