Reports until 13:43, Wednesday 25 July 2018
H1 CDS
david.barker@LIGO.ORG - posted 13:43, Wednesday 25 July 2018 (43071)
opsws2 workstation returned to ISCT1, opsws5 removed for repair

Carlos, Dave:

Carlos repaired opsws2 (the iMac which was originally at ISCT1). In the mean time, opsws5 was relocated to ISCT1 but found to have a login issue. Today opsws2 was returned and opsws5 removed for repair. Carlos verified that the iMac by the PSL enclosure (lveaws3) and the iMac by HAM6 (operator1) were in good working order. So three operational iMacs (two portable) in the LVEA and one out for repair, and of course CDS laptops can be used to augment these.