Displaying report 1-1 of 1.
Reports until 19:11, Wednesday 25 July 2018
H1 SQZ (SQZ)
haocun.yu@LIGO.ORG - posted 19:11, Wednesday 25 July 2018 (43076)
SQZT6 Updates

Updates on SQZT6:

- Diagnostic test laser moved.

- LO fiber coupler patch panel moved to the left side of the table, because of the limit length of fiber on table.

 

I tried to use an electronic fiber microscope that we have to inspect the long green fiber, but the coupler doesn't fit well..

A pic of the SQZT6 table fiber end is attached, the cladding part looks good. The coating part of the tip has some dusts (too hard to take a picture), and I cleaned it gently. Will check more on this with the other microscope.

 

Images attached to this report
Displaying report 1-1 of 1.