Reports until 16:02, Thursday 26 July 2018
H1 AOS
edmond.merilh@LIGO.ORG - posted 16:02, Thursday 26 July 2018 (43085)
Shift Summary - Day

TITLE: 07/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

15:30 Started working on Green arm alignment

17:00 Patrick to EX  to take measurements

17:09 Daniel ad TJ out to HWS table

17:28 Kyle out to LVEA

17:46 TJ and Daniel back

17:46 Sheila and Haocun out to LVEA to take measurements

18:00 Sheila and Haocun back

18:01 Mark and Tyler out to EX to retrieve a valve on the floor under the BSC

18:03 Patrick back

18:08 Marc and Fil out to MY

18:09 Dave out to CER

18:25 Marc and Fil back

18:29 Jenne ad Hang out to ISC rack in LVEA

18:30 Sheila out to LVEA w/Jenne and Hang

18:51 Dave back

19:54 Lockloss at ALS Diff - it had been there for about an hour

20:08 Haocun out to LVEA

21:03 Sheila Craig and DS out to LVEA-ISC racks

21:23 Cheryl out to PSL ante room to retrieve EOM

21:30 Kyls out to LVEA to close a few NEG isolation valves WP #7734

21:40 Jenne, Craig and DS back.

22:28 Kyle back