TITLE: 07/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
15:30 Started working on Green arm alignment
17:00 Patrick to EX to take measurements
17:09 Daniel ad TJ out to HWS table
17:28 Kyle out to LVEA
17:46 TJ and Daniel back
17:46 Sheila and Haocun out to LVEA to take measurements
18:00 Sheila and Haocun back
18:01 Mark and Tyler out to EX to retrieve a valve on the floor under the BSC
18:03 Patrick back
18:08 Marc and Fil out to MY
18:09 Dave out to CER
18:25 Marc and Fil back
18:29 Jenne ad Hang out to ISC rack in LVEA
18:30 Sheila out to LVEA w/Jenne and Hang
18:51 Dave back
19:54 Lockloss at ALS Diff - it had been there for about an hour
20:08 Haocun out to LVEA
21:03 Sheila Craig and DS out to LVEA-ISC racks
21:23 Cheryl out to PSL ante room to retrieve EOM
21:30 Kyls out to LVEA to close a few NEG isolation valves WP #7734
21:40 Jenne, Craig and DS back.
22:28 Kyle back