Ops Shift Log: 08/06/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for post 02 vent commissioning
Intent Bit: Commissioning
Support: N/A
Incoming Operator: N/A
Shift Summary: Commissioning and locking work is ongoing. Air quality has improved a little, but is still not great; current outside particulate counts are 3.8 million 0.3um and 250,000 at 0.5um/ft3.
Activity Log: Time - UTC (PT)
14:51 (07:51) Vanessa – Cleaning at End-X
15:00 (08:00) Start of shift
16:15 (09:15) Approximately 16:15 (09:15) PSL tripped - reporting a NPRO Temp Guard error.
16:20 (09:20) PSL – Back up
16:22 (09:22) Kyle – Going to End-X
16:23 (09:23) Karen – Cleaning at End-Y
16:28 (09:28) Nutsinee – Going to HAM6 area to work on IO and Squeezer tables
16:40 (09:40) Vanessa – Back from End-X – Now cleaning in the LVEA
16:54 (09:54) Filiberto – Prep work for End-X Beckhoff changes
17:12 (10:12) Equipment delivery for Bubba/Mark
17:15 (10:15) Haocun – Going into LVEA to HAM6 area
17:24 (10:24) Kyle – Back from End-X
17:29 (10:29) Travis – Going to both end stations to turn on PCal lasers
17:42 (10:42) Karen – Finished cleaning at End-Y
18:01 (11:01) Travis – Back from turning on PCal lasers at both ends
18:05 (11:05) Hugh – Going to End-X to check on wind fence
18:08 (11:08) TJ – Going to End-X
18:20 (11:20) Kyle – Going to End-X
18:22 (11:22) TJ – Leaving End-X
18:40 (11:40) Hugh – Back from End-X
18:51 (11:51) Kyle – Finished at End-X – Coming back to CS
18:56 (11:56) Georgia & Dan – Going to HWS table
19:57 (12:57) Georgia & Dan – Out of the LVEA
20:58 (13:58) Travis – Going into the optics lab to get equipment tag numbers
21:15 (14:15) Filiberto – Going into LVEA to get equipment tag numbers
21:25 (14:25) Filiberto – Out of the LVEA
21:32 (14:32) Georgia & Dan – In LVEA to work on HWS table
22:45 (15:45) Georgia & Dan – Out of the LVEA
23:00 (16:00) End of shift