Ops Shift Log: 08/07/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for post 02 vent commissioning
Intent Bit: Commissioning
Support: N/A
Incoming Operator: N/A
Shift Summary: Maintenance work completed just before 20:00 (13:00). Relocking work is ongoing.
Particle counts remained high during the day, not changing much from their 15:00 (08:00) levels. The hot temperatures and degraded air quality conditions are likely to remain for the next several days.
Activity Log: Time - UTC (PT)
13:45 (06:45) Peter – In the PSL enclosure
14:40 (07:40) Patrick – Running ETM charge measurements
15:00 (08:00) Start of shift
15:20 (08:20) Cleaning at End-Y and Mid-Y
15:22 (08:22) Chris – Escorting pest service in LVEA, and both Mids and Ends
15:33 (08:33) Rick – Going into the PSL enclosure
15:38 (08:38) TJ & Dan – Going to End-Y for HWS – Will transition to laser hazard
15:43 (08:43) Robert – Going into the PSL enclosure
15:57 (08:57) Filiberto & Ed – Going to End-X to work on wind fence Beckhoff
16:00 (09:00) End-Y is laser hazard
16:12 (09:12) Kyle – Going to End-X
16:12 (09:12) Travis – Going to End-X
16:12 (09:12) Gerardo – Replace Ion pump controller at End-Y (WP #7755)
16:20 (09:20) Chris – Pest service finished servicing site
16:24 (09:24) Travis – Back from End-X
16:44 (09:44) Kyle – Back from End-X
16:47 (09:47) Kyle – Gong into the LVEA
16:51 (09:51) Hugh – Going into the LVEA looking for equipment S/Ns
17:01 (10:01) Hugh – Out of the LVEA
17:20 (10:20) CDS – DAQ restart for WP #7749
17:25 (10:25) Robert – Out of the PSL Enclosure
17:44 (10:44) Nutsinee – Going to tables at HMA6
17:46 (10:46) Porti-Potty on site to service units
17:55 (10:55) Dick & Nolan – Making tests at ISC racks near PSL/HAM1
17:55 (10:55) Marc – Going to ISC racks
18:07 (11:07) Karen – Finished cleaning on the Y Arm
18:08 (11:08) Cintas – On site to change out mats
18:25 (11:25) Kyle – Finished in the LVEA
18:26 (11:26) Kyle – Going to End-Y
18:43 (11:43) Robert – Going into LVEA to work on coil
18:46 (11:46) Gerardo – Finished at End-Y
19:05 (12:05) Peter & Rick – Out of the PSL enclosure
19:20 (12:20) TJ & Dan – Finished at End-Y
19:20 (12:20) End-Y is Laser Safe
19:38 (12:38) Dick, Nolan, & Marc – Out of the LVEA
19:42 (12:42) Pepsi on site to service drink machines
19:45 (12:45) Filiberto & Ed – Working on surge arrester for wind fence at End-X
19:56 (12:56) Mark & Tyler – Drilling on north-west wall in LVEA
20:16 (13:16) Filiberto & Ed – Back from End-X
20:31 (13:31) Gerardo – Going to End-Y to work on Ion pump controller
21:20 (14:20) Tyler & Mark – Finished in the LVEA
22:11 (15:11) Nutsinee – Going to IOTC6 rack
22:25 (15:25) Gerardo – Back from End-Y
22:30 (15:30) Gerardo – Going to End-X compressor room to check Ion pump controller wiring
23:00 (16:00) End of shift