Ops Shift Log: 08/14/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked – Maintenance day and post 02 vent commissioning
Intent Bit: Commissioning
Support: N/A
Incoming Operator: N/A
Shift Summary: Productive maintenance day, followed by an afternoon of commissioning.
Activity Log: Time - UTC (PT)
14:18 (07:18) Dan from Apollo in H2 PSL to work on controls
14:38 (07:38) Peter – Escorting cleaning crew in PSL enclosure (WP #7771)
15:00 (08:00) Start of shift
15:12 (08:12) Karen – Going to End-Y and Mid-Y for cleaning
15:13 (08:13) Dan – Finished in the H2 PSL enclosure
15:20 (08:20) Ed – Reinstalling repaired AI Chassis (WP #7761)
15:38 (08:38) Dick & Marc – Going to ISC racks
15:40 (08:40) Christina & Vanessa – Out of the PSL enclosure
15:42 (08:42) Ed – Finished with AI chassis swap
15:57 (08:57) Norco on site N2 delivery to CP8
16:05 (09:05) Filiberto – At End-Y to upgrade EtherCat (WP #7766)
16:24 (09:24) Jason & Ed – Into the PSL enclosure to work on DBB install
16:24 (09:24) Cheryl – Into the PSL enclosure to IO pictures
16:35 (09:35) Chandra – Going into LVEA to assist Kyle
16:47 (09:47) Vanessa – Finished at End-X
16:48 (09:48) Vanessa – Going into the LVEA for cleaning
17:00 (10:00) Gabriele – Tour of LVEA (WP #7769)
17:00 (10:00 Richard & Dave – CER for IO chassis fiber replacement (WP #7774)
17:05 (10:05) Corey – Going into the LVEA for cleanup (HAM1 and Squeezer Bay)
17:09 (10:09) Hugh – In CER for SEI/ISI HAM2 field cabling swaps (WP #7770)
17:20) (10:20) Kyle – Out of LVEA – Going to Mid-X
17:21 (10:21) Filiberto – Finished at End-Y – Coming back to CS
17:22 (10:22) Hugh – Finished in CER
17:26 (10:26) Paradise Water – Service water across site
17:30 (10:30) Philippe – Checking of PEM cables in LVEA
17:31 (10:31) Cintas – On site to change out mats
17:48 (10:48) Norco – On site delivery of N2 to CP1
17:50 (10:50) Gabriele – Out of the LVEA
18:01 (11:01) Corey – Using crane by Squeezer Bay
18:15 (11:15) Filiberto – Going to End-Y (WP #7766)
18:17 (11:17) Dan – In LVEA to work on HWS table
18:31 (11:31) Philippe & Kara – Going to both ends to work on PEM cabling
18:33 (11:33) Karen – Back from Mid-Y
18:35 (11:35) Karen – Cleaning up broken glass in chiller room
18:40 (11:40) Corey – Out of the LVEA
18:55 (11:55) Filiberto – Back from End-Y
19:10 (12:10) Kyle – Back from Mid-X – Moving gas cylinder into LVEA
19:22 (12:22) Kara & Philippe – Out of LVEA
19:28 (12:28) Kyle – Out of the LVEA
20:00 (13:00) Dan – Out of the LVEA
20:07 (13:07) Dave – DAQ restart
21:45 (14:45) Nutsinee – Going to HAM6 area
22:31 (15:31) TVo & Dan – Going into LVEA to turn on TCS-Y CO2 laser
22:42 (15:42) Terry – Going to HAM6 area
23:00 (16:00) End of shift