Displaying report 1-1 of 1.
Reports until 17:26, Monday 01 October 2012
H2 AOS
thomas.vo@LIGO.ORG - posted 17:26, Monday 01 October 2012 - last comment - 10:09, Tuesday 02 October 2012(4343)
H2 BSC8 ACB De-Install
Tim N., Gerardo M., Bob A., Thomas V.

Today we assembled the support table (D1101953) with lab jacks and brought down the box portion of the Arm Cavity Baffle.  Since we were waiting for a few tooling parts to be baked (they did not fit in the bake oven on Friday), we will assemble the installation lift stand (D1101957) tomorrow in order to bring down the suspension portion of the ACB.  

Both the suspension and the box portion will be laid down in the tube while the cartridge is being removed, then the suspension and box will be extracted afterwards.   
Comments related to this report
thomas.vo@LIGO.ORG - 10:09, Tuesday 02 October 2012 (4347)
Also, we dropped a 1/4 wrench on the BSC floor plates and it slipped underneath into the bottom of the chamber, we were not able to reach it.