Reports until 10:30, Thursday 16 August 2018
H1 General
jeffrey.bartlett@LIGO.ORG - posted 10:30, Thursday 16 August 2018 (43470)
Ops Day Shift Transition
Ops Shift Transition: 08/16/2018, Day Shift 15:00 – 23:00 (08:00 -16:00) - UTC (PT)
State of H1: Unlocked for commissioning    
Intent Bit: Commissioning
Weather: Air Quality Alert remains in effect until mid-day Friday. Counts remain high at the site. This morning at 14:30 (07:30) 0.3um at 7.4M and 0.5um at 2.5M/ft3. There is a low-pressure system moving into the area today, which should improve the air quality for a few days. Highs are slated for the high 90s and there is a microscopic chance of rain later this evening. Winds are a Calm to Gentle breeze.      
Primary 0.03 – 0.1Hz: X
Secondary 0.1 – 0.3Hz: X
Outgoing Operator: N/A
Quick Summary:  Continuing commissioning work.