Reports until 16:30, Tuesday 02 October 2012
H2 AOS
thomas.vo@LIGO.ORG - posted 16:30, Tuesday 02 October 2012 (4358)
H2 BSC8 ACB De-Install
Tim N, Gerardo M, Bob A, Thomas V

We have removed the ACB in BSC8 completely off of stage-0.  The parts are currently residing in the beam tube along with the lift table that will be sent to the machine shop for re-work per Tim N.  All parts will be extracted from the chamber once the cartridge is removed.

One note is that 5 AG-plated SHCS were still stage-0, I believe these were the hand tapped holes that were used for the pushers during installation and left in as plugs for any particulate from the tapping process, I wasn't sure if I should remove them so I left them in.