There is now a mechanical beam block in the squeezer path. So the laser should not need to be turned off at the control box tomorrow morning. This will give us more time in the afternoon as we won't have to wait for it to stabilize after it's turned back on. Peter will check and put up a sign by the laser control early tomorrow morning indicating the status of the laser (attached is the table layout and the position of the added beam dump).