Displaying report 1-1 of 1.
Reports until 16:09, Tuesday 28 August 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:09, Tuesday 28 August 2018 (43706)
Ops Shift Summary
Vacuum and PEM work is still ongoing.

LVEA transitioned to laser safe
13:10 UTC Peter K. in PSL
14:54 UTC Patrick T. fixing links for picomotors, h1ecatx1, h1ecaty1 WP 7791
15:06 UTC Robert back and forth between LVEA
15:09 UTC Vacuum work started. Gate valves closed, reseating IP6, working on IP1
15:36 UTC Gerardo to HAM2, camera install on top of chamber
15:42 UTC Jeff B. and Charlie touring LVEA
15:52 UTC Ed and Corey moving totes from PSL enclosure to VPW
15:55 UTC Marc removing TCS AA chassis WP 7795
15:56 UTC Jeff B. and Charlie back
15:56 UTC Cheryl to HAM2 to help Gerardo
15:56 UTC Kara and Phillipe working with Robert on PEM
16:01 UTC LN2 delivery through gate
16:07 UTC Corey and Ed done
16:15 UTC Ed to end Y, optical lever align
16:15 UTC Betsy to LVEA to put equipment away
16:16 UTC Cheryl taking lock/tag to HAM2
16:24 UTC Karen to mid and end Y
16:39 UTC Betsy done
16:42 UTC Gabriele leading tour in CR, WP 7789
16:52 UTC Marc out of LVEA, fixing AA board
16:58 UTC Gabriele taking tour to LVEA
17:02 UTC Karen going from end Y to mid Y
17:14 UTC Gerardo done, camera install done
17:17 UTC Ed to end X, changed SEI from Windy to SC_OFF_NOBRSXY
17:18 UTC Marc reinstalling repaired AA board
17:25 UTC Georgia, Danny to end Y, HWS table align
17:26 UTC Hugh to LVEA to retrieve crane shackles
17:31 UTC Richard, Gerardo to HAM2 to look at camera installation
17:32 UTC Marc done
17:38 UTC Georgia transitioning end Y to laser hazard
17:38 UTC Tour out of LVEA, to end X
17:45 UTC Tyler, Mark, Chris to LVEA, craning
17:48 UTC Ed done
17:49 UTC Karen leaving end Y
17:49 UTC Gerardo back
17:51 UTC Greg starting GDS update, WP 7796
17:54 UTC Richard back
17:59 UTC Terry to SQZ table. Turn laser off. Open table and remove beam dump. Close table. Turn laser on. Viewports are covered, so remains laser safe.
18:06 UTC Cheryl to LVEA to pick up equipment
18:35 UTC Paradise water delivery through gate
18:36 UTC end Y back to laser safe, Georgia, Danny heading back
18:45 UTC Georgia running charge measurements
19:00 UTC Dave to CER, OAF area
19:02 UTC Changed observatory mode to preventive maintenance, 4 hours late
19:02 UTC Cheryl back
<19:06 UTC Dave back
19:14 UTC Greg done WP 7796
19:37 UTC Jim to end Y to recenter BRS
19:54 UTC Truck delivery for Richard through gate
19:54 UTC Chandra to LVEA to work on IP6
20:23 UTC Peter done
20:25 UTC Tour is finished
20:32 UTC Charge measurements done
20:34 UTC Betsy to LVEA to talk to VAC crew
20:56 UTC DAQ restart
21:20 UTC Mark and Tyler done
21:41 UTC Gerardo to LVEA
22:58 UTC Tour through gate
23:02 UTC Jeff K. working with ETMX
23:06 UTC Jim done
Displaying report 1-1 of 1.