Vacuum and PEM work is still ongoing. LVEA transitioned to laser safe 13:10 UTC Peter K. in PSL 14:54 UTC Patrick T. fixing links for picomotors, h1ecatx1, h1ecaty1 WP 7791 15:06 UTC Robert back and forth between LVEA 15:09 UTC Vacuum work started. Gate valves closed, reseating IP6, working on IP1 15:36 UTC Gerardo to HAM2, camera install on top of chamber 15:42 UTC Jeff B. and Charlie touring LVEA 15:52 UTC Ed and Corey moving totes from PSL enclosure to VPW 15:55 UTC Marc removing TCS AA chassis WP 7795 15:56 UTC Jeff B. and Charlie back 15:56 UTC Cheryl to HAM2 to help Gerardo 15:56 UTC Kara and Phillipe working with Robert on PEM 16:01 UTC LN2 delivery through gate 16:07 UTC Corey and Ed done 16:15 UTC Ed to end Y, optical lever align 16:15 UTC Betsy to LVEA to put equipment away 16:16 UTC Cheryl taking lock/tag to HAM2 16:24 UTC Karen to mid and end Y 16:39 UTC Betsy done 16:42 UTC Gabriele leading tour in CR, WP 7789 16:52 UTC Marc out of LVEA, fixing AA board 16:58 UTC Gabriele taking tour to LVEA 17:02 UTC Karen going from end Y to mid Y 17:14 UTC Gerardo done, camera install done 17:17 UTC Ed to end X, changed SEI from Windy to SC_OFF_NOBRSXY 17:18 UTC Marc reinstalling repaired AA board 17:25 UTC Georgia, Danny to end Y, HWS table align 17:26 UTC Hugh to LVEA to retrieve crane shackles 17:31 UTC Richard, Gerardo to HAM2 to look at camera installation 17:32 UTC Marc done 17:38 UTC Georgia transitioning end Y to laser hazard 17:38 UTC Tour out of LVEA, to end X 17:45 UTC Tyler, Mark, Chris to LVEA, craning 17:48 UTC Ed done 17:49 UTC Karen leaving end Y 17:49 UTC Gerardo back 17:51 UTC Greg starting GDS update, WP 7796 17:54 UTC Richard back 17:59 UTC Terry to SQZ table. Turn laser off. Open table and remove beam dump. Close table. Turn laser on. Viewports are covered, so remains laser safe. 18:06 UTC Cheryl to LVEA to pick up equipment 18:35 UTC Paradise water delivery through gate 18:36 UTC end Y back to laser safe, Georgia, Danny heading back 18:45 UTC Georgia running charge measurements 19:00 UTC Dave to CER, OAF area 19:02 UTC Changed observatory mode to preventive maintenance, 4 hours late 19:02 UTC Cheryl back <19:06 UTC Dave back 19:14 UTC Greg done WP 7796 19:37 UTC Jim to end Y to recenter BRS 19:54 UTC Truck delivery for Richard through gate 19:54 UTC Chandra to LVEA to work on IP6 20:23 UTC Peter done 20:25 UTC Tour is finished 20:32 UTC Charge measurements done 20:34 UTC Betsy to LVEA to talk to VAC crew 20:56 UTC DAQ restart 21:20 UTC Mark and Tyler done 21:41 UTC Gerardo to LVEA 22:58 UTC Tour through gate 23:02 UTC Jeff K. working with ETMX 23:06 UTC Jim done