Reports until 20:09, Tuesday 28 August 2018
H1 IOO (IOO)
cheryl.vorvick@LIGO.ORG - posted 20:09, Tuesday 28 August 2018 (43710)
changes to the IMC IN beam after PSL work today

Changes are seen on both GigE cameras.  Using the path length to the camera, and the pixel size, I calculated the angle change of the beam on IO GigE 2, and used that to calculate the change at 20m, the distance to MC2, and of course these are approximations, based on the current installation.

  change in pixels change in mm @ MC2
IO GigE 2 X (IMC_IN) 4.5 1.0
IO GigE 2 Y (IMC_IN) 9 2.0
Images attached to this report