Reports until 15:11, Thursday 04 October 2012
H1 ISC
keita.kawabe@LIGO.ORG - posted 15:11, Thursday 04 October 2012 (4375)
HAM3 IO/ISC ground loop check done

Checked DB25 connectors for IO QPD , ISC QPDs and IO/ISC picos and they're all fine. Measured from outside, no shortcircuit  between pin13 and vacuum chamber.