To enable the more automated Matlab TFs to be taken on the LHO triple test-stand, I have added the following channels (and corresponding data rates) to the channel list:- X1:SUS-HXTS_M1_TEST_L_OUT_DQ 2048 X1:SUS-HXTS_M1_TEST_T_OUT_DQ 2048 X1:SUS-HXTS_M1_TEST_V_OUT_DQ 2048 X1:SUS-HXTS_M1_TEST_R_OUT_DQ 2048 X1:SUS-HXTS_M1_TEST_P_OUT_DQ 2048 X1:SUS-HXTS_M1_TEST_Y_OUT_DQ 2048 These have been added to the *.ini files of both models i.e. "X1SUSHXTS05.ini" and "X1SUSHXTS27.ini". After logging into the test-stand front-end "ssh tripleteststand", the frame-builder has been restarted by switching models using the script "useModel27", waiting a 60 seconds, then finally returning back to the required model "useModel05". Running the "LHOTripleTFs.m" Matlab script from the "susSVN/trunk/Common/MatlabTools/SchroederPhaseTools" directory, now successfully extracts the above channels from the frame data.