Maintenance concluded around noon (19:00UTC), and the current status/plans are:
- the ISS remains the same as Peter reported in along 4301
- commissioning plans are to lock DRMI and work tonight
- Peter plans to resume diagnostics on the ISS tomorrow
Maintenance Activities:
- 04-09-18 15:12 Richard to EX for ESD - looks OK
- 04-09-18 15:13 PeterK to the LVEA to take out the ISS card
- 04-09-18 15:14 Kyle to LVEA climbing on HAM3 and on beam tube between BSC7 and the termination slab
- 04-09-18 15:23 Patrick charge measurement on EY
- 04-09-18 15:28 Fil and Mark to EX to pull cables
- 04-09-18 15:29 Chris escorting Pest Control to LVEA
- 04-09-18 15:34 Ed to EX to pull cables
- 04-09-18 15:42 Chris and Pest Control done in LVEA heading ti X arm and then to Y arm
- 04-09-18 15:56 Betsy and Travis to LVEA to look for 3IFO parts
- 04-09-18 16:18 TVo to LVEA to start up CO2 lasers
- 04-09-18 16:21 Chandra to the LVEA for vacuum work
- 04-09-18 16:27 Betsy and Travis are out of the LVEA
- 04-09-18 16:32 Chris and Pest Control are done
- 04-09-18 16:44 Fil, Mark, and Ed, back from EX
- 04-09-18 16:51 Vanessa to EX to clean
- 04-09-18 16:51 Karen to EY to clean
- 04-09-18 16:52 Nutsinee to ISCT6 to open doors and work on the laser
- 04-09-18 16:57 Richard to Mechanical Room to look at TCS power supplies
- 04-09-18 17:07 Ed to wind fence
- 04-09-18 17:13 Mark and Tyler to crane items off H2 enclosure
- 04-09-18 17:35 Jason back from MY
- 04-09-18 17:50 Dave woking on EX to recover the SUS IOP that crashed last night
- 04-09-18 17:51 Fil and Ed at EX helping Dave
- 04-09-18 17:52 Betsy to LVEA to look at the items that were craned down
- 04-09-18 18:15 Chris to Out Buildings will call
- 04-09-18 18:15 jason to EY about OpLev
- 04-09-18 18:20 Chriss called from EY and it is showing 237
- 04-09-18 18:21 ETMX work to recover IOP started at 17:44UTC and is done at 18:20UTC
- 04-09-18 18:22 Georgia starting a charge measurement at EX
- 04-09-18 18:33 Richard says there was aglitch in the safety system - may have caused sqeezer laser to trip
- 04-09-18 18:38 Chris is done checking phones and is leaving EX
- 04-09-18 18:45 Jason is back from EY
- 04-09-18 18:45 Chandra is back from EX and EY
- 04-09-18 18:46 Terry and Nutsinee to optics lab
- 04-09-18 18:47 Danny to Hartman table in LVEA
- 04-09-18 18:48 Pest Control is done on site
- 04-09-18 18:53 Tyler and Mark done craning in LVEA
- 04-09-18 18:55 Kyle and all other vacuum activities are done for today in the LVEA
- 04-09-18 18:55 Richard to EX and EY to check on ALS lasers
- 04-09-18 19:10 Peter out of the LVEA
- 04-09-18 19:15 Georgia is done with charge measurements on ETMX
- 04-09-18 19:17 Chandra done visiting vacuum components in End Stations