Today Gerardo valved in IP6 and also decoupled VE from the pump during a TOO from an earthquake. Attached is a pressure plot showing IP1 & IP6 being valved in and we now have all six IPs pumping on corner volume (IP2 has not been rebuilt yet). The pressure seems to be drifting up since we valved in IP1. We plan to leak check the corner station on Tuesday.