Reports until 16:04, Thursday 06 September 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:04, Thursday 06 September 2018 (43863)
Ops Shift Summary
14:35 - 15:39 UTC Karen to LVEA to clean
14:36 - 14:52 UTC Chris to LVEA to shrink-wrap a pallet
15:11 UTC Vanessa to LVEA and then end X to clean
15:39 - 15:52 UTC Karen to end Y
15:54 UTC Verbal notification of 8.1 magnitude earthquake from Fiji
16:02 UTC Set seismic to very large earthquake
16:13 - 16:29 UTC TJ to TCSX table to check on leak
16:20 - 17:29 UTC Marc, Ed, Filiberto to end Y to pull cable for ESD power supply
16:29 UTC Jeff K. taking BS ISI to damped, coil balancing
16:50 - 18:43 UTC Gerardo to LVEA to decouple equipment from IP6
16:53 UTC ETMY guardian crashed, TJ investigating
17:02 - 17:07 UTC Tyler moving scissor lift from LVEA to staging building through high bay
17:09 - 17:18 UTC Nutsinee to ISCT6 rack
17:23 - 18:12 UTC Dave to end stations to look at computer racks
17:26 - 17:55 UTC Karen to H2 building
17:28 - 17:40 UTC Betsy to LVEA to take measurements
18:11 - 20:31 UTC Filiberto WP 7803
18:24 - 20:31 UTC Ed to LVEA WP 7803
18:30 - 18:44 UTC Betsy to LVEA
19:57 UTC Set seismic to recover from earthquake
20:56 - 22:03 UTC Gerardo to end X to retrieve leak detector
20:57 - 21:05 UTC Ed to CER