H1 SEI
jim.warner@LIGO.ORG - posted 15:27, Friday 05 October 2012 (4388)
BSC assembly #3/ BSC2 (or 1? I don't remember...) assembly status
HughR, GregG, JimW

 Between yesterday afternoon and today, the stage 2 of this assembly had its cap sensors aligned, gapped, then the stage was floated and leveled. After more cps fine tuning, a first pass at cable routing and a round of locker tuning I think stage 2 is pretty well dialed. On Monday we will do more of the same on stage 1, then one more pass at cabling. After that, this ISI should be ready for its first round of testing.