TITLE: 09/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 5mph Gusts, 3mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.19 μm/s
QUICK SUMMARY:
Commissioners busy working on H1. The PSL issues weren't observed in the morning, but appeared to go away after a FSS VCO power cycle by Keita.
- Commissioning began with alignmment by Gabriele since the PSL appeared to be fine (compared to having issues
- 16:38 Fire Dept recovering vehicle at EY, will need to move over
- 16:45-17:15 Ed covering
- 16:46-17:33 TCS Chiller visit (Thomas, Dan, TJ)
- 16:47 Checking LVEA test stand/plug forklift (Mark & Tyler)
- 17:27 Vanessa out to End Stations
- 18:49 SQZT6 visit by Sheila/Terry....will want to chat with Haocun
- 18:50 PSL/FSS issues from weekend returning.
- 19:00 FSS VCO power cycle to address above issue (Keita)
- after 20:00 EY copper tubing work in Fan Room (Mark & Tyler)
- 20:05 Ken at warehouse
- 20:43-22:00 ISCT6 work (Nutsinee)
- 22:20-22:40 EX computer check (receiving, not VEA) by David B.
- 22:01 Dessicant packs put into SUS pelican case in LVEA (TJ)
- While leaving LVEA, TJ noticed LOUD Beeping. This is a known issue regarding a UPS for the PSL. See previous note about this LOUD beeping back in July.
- Will tag this alog with DetChar in case someone wants to look at these beeps with microphones (in case this issue slips through to O3).
- 22:45 Gerardo out to End Stations to pick up some cables which will be needed for tomorrow.