[Sheila, Hang, Gabriele]
In brief, the L1 LOCK gain in ITMX was 10 instead of 1 (as it used to be during O2). Therefore the reallocation of pitch and yaw to M0 was ten times stronger, and it modified the suspension angular response as seen by the ASC at the lower stages. This created a crossover at about 1 Hz that produced the right-half-plane zero we measured in CHARD and DHARD. This wrong gain was there only in ITMX. We reverted it to 1 as it was during O2. The gain was changed from 1 to 10 on Saturday June 2nd 2018 at about 21:55 UTC. Nothing relevant written anywhere in the elog.
The plot below shows the yaw to yaw response of ITMX, measured with the optical lever, in a few different configurations.
The expectation is that this will fix the DHARD/CHARD plants (43844)
We implemented the low pass filters in all test mass M0 stages, since it gives us some more phase and gain margin at about 1.8 Hz, where there is still a zero.
The story of how we found this problem is long and convoluted. A brief summary below:
As part of this story, Jenne Hang and I checked the calibration of the test mass oplevs using the baffle PDs.
ITMY pit oplev is about 4% larger than what I got from the baffle PD, yaw is 3.5% lower, ETMY pit oplev is 13% high and yaw is 2% high. Jenne did a similar check for the Y arm optics, and I think that she also found that the optical lever calibrations are OK. (for locations of baffle PDs see D1200657)
The check that there wasn't a cross coupling between pitch and yaw on the ITM optical levers, Jenne and Hang steered the green beams to PD2 +PD4 on the ETM baffles, and in both cases the optical lever response in yaw was about 2% of the pitch response.
It would be great if someone could follow up on the ITM pitch to yaw cross coupling during some down time (without the confusion about top mass offloading).
For the yaw to pitch coupling, we already have good measurements of all test mass actuation responses. We only have to repeat the ITMX measurements since they were taken with the wrong M0 offloading. This will take about (10+10)*100 s = 2000 s of interferometer offline.
I will post more details with the measurements tomorrow, and hopefully there will be time to repeat the ITMX measurement.
Commenting on Sheila's log about oplevs checks:
To check the calibration:
To check that true pitch motion is reported by the oplev as pitch-only, and not a combination of pitch and yaw: