TITLE: 09/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
Gabriele and Jenne working on locking
15:00 PSL meeting via TeamSpeak
15:46 Nutsinee driving down Y-Arm to have a look at the burned area of the desert
16:11 Nutsinee back and going out to ISCT6
16:16 Guest for Chandra on site
16:38 Mark, Tyler, and Chris to MY to install grease lines for fans and to seal up areas where bats may be getting in
17:00 Safety Commission tour into LVEA for tour.
17:24 Vanessa to MX
17:45 Chandra and guest to mid-stations
18:00 Kyle out to LVEA to recover light equipment. He'll be entering through man door at Lg equipment entry
18:40 Tour out of LVEA
18:51 Karen back to corner
19:04 Mark, Tyler , and Chris back for lunch and are setup at MX for same work.
19:40 Karen to EY
20:00 Mark, Tyler, and Chris to EY
20:32 Karen leaving EY
20:32 Tour group leaving EY
20:41 TVo out to LVEA to turn on CO2X LASER
22:00 Site meeting