Reports until 16:03, Wednesday 12 September 2018
H1 General
edmond.merilh@LIGO.ORG - posted 16:03, Wednesday 12 September 2018 (43960)
Shift Summary - Day

TITLE: 09/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

Gabriele and Jenne working on locking

15:00 PSL meeting via TeamSpeak

15:46 Nutsinee driving down Y-Arm to have a look at the burned area of the desert

16:11 Nutsinee back and going out to ISCT6

16:16 Guest for Chandra on site

16:38 Mark, Tyler, and Chris to MY to install grease lines for fans and to seal up areas where bats may be getting in

17:00 Safety Commission tour into LVEA for tour.

17:24 Vanessa to MX

17:45 Chandra and guest to mid-stations

18:00 Kyle out to LVEA to recover light equipment. He'll be entering through man door at Lg equipment entry

18:40 Tour out of LVEA

18:51 Karen back to corner

19:04 Mark, Tyler , and Chris back for lunch and are setup at MX for same work.

19:40 Karen to EY

20:00 Mark, Tyler, and Chris to EY

20:32 Karen leaving EY

20:32 Tour group leaving EY

20:41 TVo out to LVEA to turn on CO2X LASER

22:00 Site meeting