Reports until 15:58, Thursday 13 September 2018
H1 General
edmond.merilh@LIGO.ORG - posted 15:58, Thursday 13 September 2018 (43985)
Shift Summary - Day

TITLE: 09/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:

Day mostly dominated by TCS work
LOG:

15:30 Vanessa out to LVEA - cleaning

16:30 Nutsinee out to HAM6 area - ISCT6

16:59 Vanessa out to EX

17:15 Haocun out to LVEA - w/Nutsinee

17:33 Nutsinee out

17:34 Vanessa out to EY

17:41 Mark, Tyler, and Chris out to work on the outside of EX sealing bat-holes.

18:37 Marc and Dave ou to LVEA - cabling from H2 building into LVEA

20:00 Commissioning meeting

21:13 Mark, Tyler, and Chris back from EX

21:18 Marc and Gerardo pulling cables back into H2 building from LVEA - Gerardo into LVEA; Marc into H2 building

21:25 Gerardo back

21:38 Gerardo out to LVE to valve in neg pumps - aLog

22:11 Nutsinee, Haocun, and Terry out to TCSY area

22:37 Terry back - Nutsinee and Haocun still out