TITLE: 09/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
Day mostly dominated by TCS work
LOG:
15:30 Vanessa out to LVEA - cleaning
16:30 Nutsinee out to HAM6 area - ISCT6
16:59 Vanessa out to EX
17:15 Haocun out to LVEA - w/Nutsinee
17:33 Nutsinee out
17:34 Vanessa out to EY
17:41 Mark, Tyler, and Chris out to work on the outside of EX sealing bat-holes.
18:37 Marc and Dave ou to LVEA - cabling from H2 building into LVEA
20:00 Commissioning meeting
21:13 Mark, Tyler, and Chris back from EX
21:18 Marc and Gerardo pulling cables back into H2 building from LVEA - Gerardo into LVEA; Marc into H2 building
21:25 Gerardo back
21:38 Gerardo out to LVE to valve in neg pumps - aLog
22:11 Nutsinee, Haocun, and Terry out to TCSY area
22:37 Terry back - Nutsinee and Haocun still out