Re-energized the following devices at the Y end station which were turned off on Friday, Oct. 5, 2012 for software debugging: H2-SEI-C1 rack - (3) coil drivers, reset overtemp condition after powerup. H2-TCS-C1 rack - Ring heater driver, A/I filter box. H2-SUS-C1 rack - (3) A/I filter boxes.