Reports until 15:53, Friday 14 September 2018
H1 General
edmond.merilh@LIGO.ORG - posted 15:53, Friday 14 September 2018 (44002)
Shift Summary - Day

TITLE: 09/14 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

15:15 Karen out to LVEA

15:34 TVo out to TCS tables - checking on FLIR camera(s)

15:55 Nutstine out to LVEA - ISCT6

Ongoing TCS work:  Adusting Differential lens to fix spot/mode for ASAIR (TVo, Danny)

working through All-Hands (Thanks Corey)

17:06:  Tour of LVEA for A+ completed (Jeff K & Charlie T)

17:25-17:40: Trip to MY/EY for water resupply/quick clean possibly (Karen)

17:29 Haocun joining Nutsinee for Squeezer measurements out at HAM6. - both came out for All Hands

17:35-out? Making measurements (tape measure) out on the floor in LVEA (Betsy & Chandra).

20:33 Jason to MX - 3IFO stuff

20:54 performed "Load Coefficients" command on H1ASC - changes did NOT include actual filter changes as per the script results

21:00 Jason back