Displaying report 1-1 of 1.
Reports until 16:31, Tuesday 09 October 2012
H2 SEI
vincent.lhuillier@LIGO.ORG - posted 16:31, Tuesday 09 October 2012 (4403)
Optical levers drift - 2 day measurement at EY

Thomas and I started a 2-day measurement at EY to evaluate the drift of the optical levers. For this long measurement, HEPI and ISI are controlled (no sensor correction) and SUS is damped.
If you plan to work at EY, please stop by the control room to inform the operator of the day. Your activity might trip the ISI-HEPI watchdogs and ruin the long measurement.

Displaying report 1-1 of 1.