Reports until 17:30, Tuesday 09 October 2012
LHO VE
kyle.ryan@LIGO.ORG - posted 17:30, Tuesday 09 October 2012 (4406)
Water in instrument air @ the corner station
Routine site inspection revealed that water is accumulating at the LN2 LLCV actuator bowl drain (point-of-use) for CP1 and CP2 -> Found that the corner station instrument air drying tower was working but that the tower regeneration purge rate valve was adjusted to ~15 psi (should be ~65 psi) -> adjusted and opened bowl drains, let air flow until dry. Will check tomorrow.