TITLE: 09/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
Started with alignment and locking as per usual. Some work on the floor, but mostly regular commissioning.
LOG:
- Contractors before 8am: asphalt crack person & weed spraying
- 14:53-15:20 EY cleaning Karen
- 14:57-done EX cleaning Vanessa
- 15:38 SEI investigations (re: ITMy) at racks in CER [FRS11497] (Jim)
- 16:40-17:43 Parking lot (at MY/EY) asphalt work.
- 17:15-17:46 HAM5 tape measure check (Gerardo)
- 18:12 Picking up BS oplev controller (ed)
- 18:38-20:00 ISCT6/SQZ6 work (Nutsinee)
- 21:41 heading back out (Nutsinee)
- 21:55-22:39 Terry joining.
- 19:36 Hanford phone call for DRILL for "Take Cover". This was for surrounding areas & not us. Terminated at 20:00.
- 20:36-21:02 ISCT1 Comm beatnote alignment on table (Georgia)
- 20:36-21:02 PSL rack IMC measurements (Craig)
- 20:45 fiber pulling from msr to cer (Richard, fil, ed)
- 20:45 Out to ITMy satellite box [FRS11497] (jim)
- 21:30 PNNL tour (hugh)
- 22:44- 23:02 current PSL rack checks (Sheila & Craig)