Reports until 15:59, Wednesday 26 September 2018
H1 General
edmond.merilh@LIGO.ORG - posted 15:59, Wednesday 26 September 2018 (44172)
Shift Summary - Day

TITLE: 09/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:

Highlights:

LOG:

15:15 Karen and Vanessa out o the LVEA

15:55 Crack sealers on site - really funny typo if not careful!

16:11 Nutsinee out to LVEA -ISCT6

16:13 Vanessa out to MX and EX

16:19 Nutsinee back

17:13 Karen out to EY

19:56 EX system crash -Dave B out to investigate

20:47 All Systems at EX re-aligned and fully isolated.

20:48 beginning lock procedure - to PREP_ACS_FOR_FULL_IFO

21:20 Chandra taking Pfifer vacuum group to MY

21:25 Kyle out to LVEA - recovering equipment just inside the door

21:27 Fil to cleaning area

21:28 Kyle back

22:00 Site Meeting

22:25 Georgia and Craig to EX - looking at PLL