Reports until 12:14, Monday 08 October 2018
H1 CDS (CDS, SQZ)
richard.mccarthy@LIGO.ORG - posted 12:14, Monday 08 October 2018 - last comment - 16:11, Monday 08 October 2018(44404)
Safety Interlock EY takes down ALS/SQZ lasers.

The End-Y safety interlock system for E-stops had a failure.  This shut down the ALS and SQZ lasers.  An input module that monitors the VEA Entry Estop lost one of two channels.  This caused and error in the system and thus shut down teh lasers.  We would have been down for an hour except we struggled getting the system back up.  It appears that the module we tried to replace teh bad unit with also had trouble.  This module was taken from a test stand so we are not sure of it's pedigree.  We again swapped the module with a replacement and the system returned ot normal.  All lasers restored by noon.

Comments related to this report
filiberto.clara@LIGO.ORG - 13:28, Monday 08 October 2018 (44407)

FRS 11613

Beckhoff module EL1904 was replaced. Safety System is now back up. ALS lasers at both the end stations are now on. FRS 11613 was closed.

patrick.thomas@LIGO.ORG - 16:11, Monday 08 October 2018 (44414)
In addition, for some reason when I rescanned the bus for the replaced module, I lost the links to the spare and squeezer interlock readbacks. I relinked them and committed the update to svn.