TITLE: 10/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 4mph Gusts, 3mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.26 μm/s
QUICK SUMMARY:
Commissioners working on H1 after a quiet night seismically, & an ALL-GREEN CDS overview.
Jim reports BRS has been drifting out of range & this is mostly related to EX temperature drifts (see alog #44597). He's going to talk to Richard to see about HVAC adjustments for EX. We'll see if Commissioners can make headway with what we have; if BRS EX causes too much grief, Jim will need to re-center/damp at EX.