Reports until 17:11, Wednesday 17 October 2012
X1 SUS
jeffrey.bartlett@LIGO.ORG - posted 17:11, Wednesday 17 October 2012 (4472)
Phase 1b Testing of H1-SRM
   Ran TFs on H1-SRM last night, see attached plots. Results showed rubbing, suspected as being on the Top Mass side. A check of the suspension found both the left side EQ stops were touching the mass, which we backed off. We rechecked all other EQ stop and adjusted as necessary. We centered the Tablecloth, BOSEMs, and reset to 50% light. The TFs are setup to run tonight starting at 18:00.
Non-image files attached to this report