Reports until 14:40, Thursday 18 October 2012
H1 SUS
travis.sadecki@LIGO.ORG - posted 14:40, Thursday 18 October 2012 (4481)
ITMy retrofits

ITMy has had its ECD magnets replaced with the dummy Al blocks and BOSEM captured screw brackets installed.  Due to the change of COM induced by the ECD magnet replacements (actually a correction to the COM as calculated), some minor pitch alignment work is required on both chains.  This alignment will be done to the "by-eye" level tomorrow.  Simultaneously, we will work on recabling and beginning to re-test.