14:16 UTC Chris S. starting at end X supply fan room to grease fans. In order end X, mid X, mid Y, end Y 14:27 - 16:12 UTC Corey running charge measurements 14:36 UTC SEI config to SC_OFF_NOBRSXY 14:37 UTC Ran dust monitor check. All report OK. 15:00 - 15:38 UTC Kyle to end Y to start pumps on BSC10 15:14 UTC Vanessa to LVEA 15:29 UTC LN2 delivery 15:35 UTC Set HAM 2 ISI to DAMPED. Ed and Filiberto to HAM1,2 for cabling 15:42 - 18:43 UTC TJ, Thomas to LVEA, opening HWS table, taking pictures 15:44 UTC Jason to PSL enclosure, DBB work 15:56 UTC Cheryl to PSL enclosure 16:10 - 17:22 UTC Hugh to end stations, HEPI maintenance 16:10 UTC Marc to join Fil 16:17 UTC Jim to end X, BRS 16:18 UTC Jeff J. to LVEA, safety inspect 16:25 UTC SUS ETMX, TMSX to safe. Dave, SUS ETMX model restart, 20 bit DAC 16:25 UTC Corey to join Cheryl 16:27 UTC Vanessa to endX, endY 16:33 - 17:13 UTC Bubba to LVEA, 3IFO inspection 16:38 UTC h1calcs model change 16:42 - 18:50 UTC Chris to LVEA, forklift charging, etc. 16:44 UTC Christina, forklift by VPW 16:58 UTC Richard to mechanical room to look at heater circuits 16:58 UTC Terry to ISCT6 16:59 - 18:58 UTC Dick to ISC racks, RF measurements 16:59 UTC Nutsinee to ISCT6 17:08 UTC Jeff J. to end Y, safety inspect 17:22 - 17:30 UTC Hugh to LVEA to locate tools near squeezer bay 17:30 - 17:40 UTC Tour in CR 17:31 - 17:57 UTC Richard to mechanical room 17:40 - 18:06 UTC Gerardo to mid and end stations, checking for filters on fan exhaust 17:50 UTC Ed, Filiberto done, heading to end X to terminate cables 17:52 UTC HAM2 to isolated 17:54 UTC Dave, Jeff restarting ETMY SEI model 18:10 UTC Observatory mode to preventive maintenance, thought I had earlier 18:12 UTC Greg, DMT update 18:14 - 19:01 UTC Ed and Fil at end X, cable work, turning HV off 18:18 UTC DAQ restart 18:39 - 19:11 UTC Dave to end Y 19:20 UTC Pepsi truck through gate 19:23 UTC Corey, Cheryl and Jason done in PSL enclosure 19:30 UTC Observatory mode to locking 19:41 UTC DAQ restart 19:45 UTC ISI config to WINDY, starting initial alignment 20:27 UTC Restarted video0 20:42 UTC Greg M. done calibration update 20:58 UTC Observatory mode to commissioning 21:53 - 22:33 UTC Gerardo to end X fan room