Reports until 16:19, Wednesday 05 January 2011
H2 INS
corey.gray@LIGO.ORG - posted 16:19, Wednesday 05 January 2011 (451)
Removal Of HAM10 SEI Stack And Clean Storage Of Hardware
(Carolyn P., Corey G., Jodi F., Joe D., Justin B., Mitchell R., Rodney, Zach)

Once the north door for HAM10 was removed, an SEI crew began work for removing HAM SEI hardware.  This was similar to the HAM7-9 work, but For this task, we were required to keep all the hardware clean, and store it (for later re-use).

This work went very smoothly (the duration of the job was around ~3hrs).  All of the hardware is being stored in the north bay of the LVEA (see photo).  A note about the big stuff:

Optics Table is resting on one pallet.  If it needs to be moved, one will either need to basket the Table with straps and use the crane (or one will need to re-attach the Optics Table Hoist Plate and the forklift).  

For the Leg Elements (masses), we foiled one of each mass, and put both of them in an Ameristat bag (so we four stacks of masses on a pallet).  So, it should be noted that these two masses are "loosely" packed in their bags---so be careful, if these ever need to be crated over the beam tube.

All of the small stuff (washers, springs, screws, etc.) are bagged and resting on top of the Optics Table.
Images attached to this report