Reports until 15:54, Wednesday 24 October 2012
LHO General
patrick.thomas@LIGO.ORG - posted 15:54, Wednesday 24 October 2012 (4516)
Ops Summary
Foundry switch at end Y was accidentally unplugged. This disconnected the vacuum system, weather station and dust monitors. They are back up.

Dave, Jim adding dolphin network at end Y.

Installing BS on BSC2 ISI on Test Stand in LVEA.