Reports until 14:28, Friday 09 November 2018
H1 SQZ (SQZ)
haocun.yu@LIGO.ORG - posted 14:28, Friday 09 November 2018 - last comment - 09:27, Saturday 10 November 2018(45164)
SQZ Vent Prep - Fiber arrangements & mode match

[Sheila, Terry, Haocun]

Fiber arrangement:

Feedthrough and Mode Matching Solution:

4 Irises were placed on ISCT6 for alignment references.

Comments related to this report
daniel.sigg@LIGO.ORG - 17:38, Friday 09 November 2018 (45171)

Terry Nutsinee Daniel

The cables for the OSA were routed through a new feedthrough panel. There are no gaps left.

The cleanroom curtains were lowered around ISCT6 and SQZT6.

nutsinee.kijbunchoo@LIGO.ORG - 09:27, Saturday 10 November 2018 (45172)

Some additional information:

  • 100mW is now going to the SHG. Since the temporary EOM set up has been removed we now can use half wave plate as power control again (for green power to fiber coupler).
  • Current transmission from the pump coupler to end of 5 m fiber on ISCT6 is 71%. Terry plan on working on improving this during the weekend.
  • About 57% total transmission from ISCT6 table to the end of 2m cable. ~8% total transmission from ISCT6 to SQZT6 (looking at pump refl).
  • The power coming through was enough to lock the OPO. 5 irises were placed on the SQZT6. 3 for red path (to homodyne), 2 for pump path (to OPO refl).
Images attached to this comment