[Sheila, Terry, Haocun]
Fiber arrangement:
- The patch panel with sleeves of CLF and Green path was moved to the left side of the table.
- The on-table fiber was changed to 5m ones for both green (Thorlabs P3-460P-FC-5) and CLF (Fabrice).
- The temporary fiber arrangement from HAM6 to ISCT6 for green: orignal 6m + new Thorlabs 2m as a shield. This part will be changed to a new 5m Thorlabs P3-460P-FC-5 on Monday together with the new feedthrough.
Feedthrough and Mode Matching Solution:
- I double-checked the mode matching for feedthrough SN7 using Fabrice's Measurements.
- SN7 Mode: waist radius = 156um @ 0.36m out from fiber coupler. The same solution can be used, reaching an overlap of 98.5%.
- SN2 will be a back-up option, which was a prototype.
4 Irises were placed on ISCT6 for alignment references.
Terry Nutsinee Daniel
The cables for the OSA were routed through a new feedthrough panel. There are no gaps left.
The cleanroom curtains were lowered around ISCT6 and SQZT6.
Some additional information: