Reports until 07:01, Monday 12 November 2018
H1 General (AOS, SQZ, SUS, SYS, TCS)
richard.mccarthy@LIGO.ORG - posted 07:01, Monday 12 November 2018 (45210)
HV shutdown in prep for vented volumes

In prep for this weeks vented volumes followed M1300464 and shut down High Voltage and other system of concer.

EY

Ring Heater switched off

+-430V  ESD supplies shut off

Pico Motors disabled.

Corner station

Ring Heaters for ITMs and SR3 where shut off.  ITMX was already off.

Fast shutter controller HV disabled chassis powered down Power supply off

PZT unit powered down PZT power supply off.

ESD Power supply off

All pico motors confirmed to be or placed in disabled.

OPO TEC servo turned to the off position.

 

 