Reports until 14:38, Monday 12 November 2018
H1 CDS
filiberto.clara@LIGO.ORG - posted 14:38, Monday 12 November 2018 (45228)
Safety Controls and Slow Controls

With PSL being down this morning replace and cleanup fiber cabling in the MSR and CER. This work effected both the Safety and Slow Controls systems.