TITLE: 11/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY
LOG:
16:20 HAM2 SEI re-isolated
16:22 re-isolated BS sei
16:30 Betsy and Fil out to EY
16:57 Jason out to PSL
17:07 Richard to Ends to check grounding
17:15 Norco on site for LN2 delivery - #76 CS-X
17:16 Laser Hazard
17:22 Sheila out to LVEA- joining Terry at HAM6
17:31 Norco on site for LN2 delivery - #79 N-MX
18:08 Nutsinee out to LVEA - HAM6
18:09 Marc out to LVEA - HAM6 and PSL/ISC rack area WP#7940
18:15 Set EY sei for in-chamber work - ISI to Offline_HEPI on ... tripped anyway
18:38 Dave B resetting LSC and then DAQ (in 5)
19:09 EY system crash - Dave B investigating the cause
19:15 Peter back
19:25 Jason back for lunch
19:18 Richard out to EY to investigate sys crash
19:49 Richard back
19:58 Dan and Dan out to LVEA - ITMY Hartmann table
20:20 Pepsi on site
20:55 Sheila, Terry, Haocun, Fabrice and Nutsinee back
21:15 Dan and Dan back
21:35 Jeff B and Marc P out to LVEA - Jeff for tools; Marc for a chassis
21:40 Jeff back
21:46 Sheila out to LVEA - HAM6
21:52 Cheryl out to PSL
21:56 Fil out to CER
22:03 Terry out to LVEA - HAM6
22:06 EY ISI re-isolated after stage 2 trip
22:23 Nutsinee out to LVEA - HAM6
22:41 Peter back
22:51 Marc back
23:03 Richard out to CER
23:03 Chris S back from EY - doors back on
23:08 Chandra out to EY
23:16 Richard back
23:49 TVo out to LVEA - ITM OpLevs showing no sum