h1lsc code update
Daniel, Dave:
A new h1lsc model was installed. DAQ restart was required.
Slow Controls, new C1-PLC2 code
Daniel, Dave:
a new h1ecatc1plc2 was started this morning. Its INI file was updated in the DAQ. Its SDF system was restarted (h1sysecatc1plc2sdf) and the new channels were ACCEPT-MONITORED.
WP7098 h1tw0 offload
Dave:
The offloading of raw minute trends from h1tw0 to h1ldasgw0 completed this morning. h1nds0 was reconfigured to serve these data from their new location.
EY Dolphin crash.
At 11:04 for reasons unknown, EY suffered a Dolphin crash. It is unsure if it was related to BSC10 in-chamber work. All models were restarted on h1susey, h1seiey and h1iscey.
TMSY ring up.
Betsy, Hugh, Ed, Dave:
over the lunch hour TMSY rang up and tripped the SWWD. Investigation is continuing.
DAQ Restart:
Dave:
For h1lsc, h1ecatc1plc2 and h1nds0 changes.