I was asked to final-torque the 2.75" CFF which is part of the recently replaced squeezer fiber cable assembly at HAM6. Fabrice had installed this assembly previously but was concerned about using a wrench to complete the task as multiple mechanically vulnerable components reside close by.
For future reference, I have attached a photo showing the routing of this fiber (within orange loom) - Don't mechanically manipulate this run of fiber.