(Niko, Corey, Hugh, Keita, Georgia, Craig, Richard, Fil, Ed)
Today was the big day to squeeze in a variety of HAM1 Tasks. Once the doors were removed this morning, a suite of activities ensued:
- HAM1 Checklist items post doors removal:
- Installed (2) separate cable runs for the (4) L4C pods to be installed.
- Installed (2) cables for the new in-vac REFL_B PD.
- Continuity test run on cables: PASSED
- New REFL PD assembled & coarsley installed
- Flashlight test (& compared to original REFL_A PD): PASSED
- 90/10 beamsplitter removed from Beam Diverter & swapped with a High Reflector + Black Glass
- Beam Diverter operation tested: PASSED
- (2) L4C Pod Cable runs were tested with emulator: PASSED
- Installed (4) L4C Pods inside the HAM1 Optic Table
- Adjusted ASC_REFL_A Beam-dump to clear optics table 1/4-20 hole.
- Removed cable clamp near RM1 (for the REFL_A PD) to allow for access work for installation.
Hugh will post specifics for L4C installation and for remaining tasks (and I will post photos).
Keita will post specifics for REFL_B PD installation.
Since, there has been a recent search for the D1300278 cables, and just for documentation, wanting to update this alog to note that the cable for this new REFL PD (LSC REFL B) was D1300278-V2-S1301459 (the shorter 106" long cable) and entered into ICS for this installation in Nov2018.