Ops Shift Transition: 11/15/2018, Day Shift 16:00 – 00:00 (08:00 -16:00) - UTC (PT)
State of H1: Unlocked for vent
Intent Bit: Maintenance
Weather: Foggy with Calm winds, Forecast is for cloudy overcast with temperatures in the high 40s to low 50s.
Primary 0.03 – 0.1Hz: 0.02µm/s
Secondary 0.1 – 0.3Hz: 0.5um/s
Outgoing Operator: N/A
Quick Summary: Pump down of End-Y underway, work continues at HAM1 and HAM6, The vertex is being vented for leak repair