Ops Shift Log: 11/15/2018, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for vent
Intent Bit: Maintenance
Support: N/A
Incoming Operator: N/A
Shift Summary: Leak repair is finished and the pump down of the Vertex is underway. Work continues on the PSL, HAM1, and HAM6
Activity Log: Time - UTC (PT)
14:35 (06:35) Peter – In PSL enclosure
15:13 (07:13) Chris – Tumbleweed bailing along the X-Arm
16:00 (08:00) Start of shift
16:02 (08:02) Chandra – Going into the LVEA to check on the vertex vent
16:37 (08:37) Ed – Taking equipment to Peter in the PSL enclosure
16:42 (08:42) Ed – Back from LVEA
16:44 (08:44) Richard & Filiberto – Electrical testing at End-Y
16:45 (08:45) Chris – Finished tumbleweed bailing
16:45 (08:45) Chris – Going into LVEA to assist with leak repair
17:00 (09:00) APS – Onsite to install key pad for access controls
17:02 (09:02) Jason – Going into the PSL enclosure
17:11 (09:11) Chris – Out of the LVEA
17:23 (09:23) Marc – Back from End-Y
17:25 (09:25) Richard & Filiberto – Back from End-Y
17:38 (09:38) Rick – Taking parts to PSL enclosure
17:48 (09:48) Chandra – Going into LVEA to start leak repair
17:50 (09:50) Hugh – Going to HAM1
17:55 (09:55) Bubba – Going to End-X
17:55 (09:55) Corey – Going to HAM1
18:01 (10:01) Ed – Going into the Bier Garten to measure for cable runs
18:04 (10:04) Filiberto & Marc – Going to End-Y for ESD testing
18:09 (10:09) Rick – Out of LVEA
18:21 (10:21) Rick – Taking parts to PSL enclosure
18:26 (10:26) Jason – Out of the PSL enclosure
18:40 (10:40) Start Vertex pump down – No in chamber work
18:41 (10:41) Travis – Going to Mid-X for 3IFO
18:51 (10:51) Karen – Cleaning at End-Y and Mid-Y
18:58 (10:58) Gerardo – Going into the LVEA for leak fix pump down
19:00 (11:00) Terry – Out of the LVEA
19:06 (11:06) Corey – Out of the LVEA
19:15 (11:15) Chandra & Gerardo – Out of the LVEA
19:18 (11:18) Peter – Out of the PSL enclosure
19:20 (11:20) Danny – Going to End-Y to take images on HWS table
19:20 (11:20) Karen – Back from End-Y arm cleaning
19:35 (11:35) Danny – Transitioned End-Y to laser hazard for HWS table work
20:14 (12:14) Daniel – Going to ISC rack at HAM1 for electronics testing
20:45 (12:45) Daniel – Out of the LVEA
20:50 (12:50) Danny – Transitioned End-Y to laser safe
20:55 (12:55) Peter – Going into PSL enclosure
20:58 (12:58) Danny – Back from End-Y
21:00 (13:00) APS – Going to both end stations for access system work
21:10 (13:10) Rick – Going into the PSL enclosure
21:38 (13:38) Travis – Going to End-Y to turn on PCal camera
21:40 (13:40) Karen – Cleaning in the H2 building
21:42 (13:42) Kyle – Going to End-X to recover equipment
22:00 (14:00) Dave – Monit front end changes (WP #7946)
22:27 (14:27) Georgia & Filiberto – Going to End-Y to test ESD
23:11 (15:11) Marc – Taking equipment to End-Y
23:45 (15:45) Cheryl – Going into PSL enclosure to make optics positions drawings
23:47 (15:47) Hugh – Going to HAM1 to prep for rebalancing
00:00 (16:00) End of Shift