TITLE: 11/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
16:32 Dave B called in to check in - he's on his way in to begin his
16:35 Chandra out to LVEA - HAM1 door
16:58 FIl and Marc out to LVEA - cable from Vac rack to HAM4
16:59 Richard out to LVEA
17:08 Cheryl out to the PSL
17:11 Richard back
17:15 Cleaning crew out to end stations
17:38 BRS has been switched off at both end stations
17:45 Gerardo out to LVEA
17:55 Peter back
17:50 Jeff J out to LVEA
18:05 FIl and Marc working on the Safety Interlock system - TCS
18:10 Door crew - E door HAM1 is on W door is still off; Crew is moving to HAM6 endcap
18:14 Betsy out to LVEA - walkaround
19:00 Tour group into CR
19:01 Jim W out to LVEA - HAM3 area
19:02 Betsy out to LVEA
19:19 Richard out to LVEA
19:34 Stop work order
19:55 Jason and Cheryl back
20:01 Jim to CER - approved by Mike L
20:23 All core optics put in "Safe" state for model reboots
21:41 Stop Work lifted -Chandra out to IP2
21:57 Corey and Hugh out to Ends - Wind Fence surveying
22:21 Cheryl out to the PSL
22:30 Jason out to PSL
22:36 recovering IFO (as much as possible) from model reboots and DAQ restart
22:38 Ops Overview came back in "Locking" mode - reset to "Corrective Maintenance"
23:00 Fil out to LVEA - HAM6
23:05 Hugh out to LVEA - HAM6
23:11 Betsy out to LVEA - HAM6
23:33 Jeff J out to LVEA
23:37 Betsy and Hugh back
23:47 Betsy ou to EY - looking for HAM door bolts