Reports until 11:17, Wednesday 21 November 2018
H1 IOO (IOO)
cheryl.vorvick@LIGO.ORG - posted 11:17, Wednesday 21 November 2018 - last comment - 14:22, Wednesday 21 November 2018(45440)
IO on PSL for Nov.20

Cheryl, Jason

Images attached to this report
Comments related to this report
cheryl.vorvick@LIGO.ORG - 13:16, Wednesday 21 November 2018 (45451)

plots of data for PMC, ideal, and measured, and beam scan data collected yesterday, as well as distances used for the plots in a matlab .m file, and a huge image (7.5MB).

Images attached to this comment
Non-image files attached to this comment
cheryl.vorvick@LIGO.ORG - 14:11, Wednesday 21 November 2018 (45452)

beam scan data from the bottom periscope is attached, distances are from the PZT, and the lens after the bottom periscope mirror is ~238.5mm from the PZT.  

Non-image files attached to this comment
cheryl.vorvick@LIGO.ORG - 14:22, Wednesday 21 November 2018 (45454)

DUE TO SPACE AND COOLING LINE ISSUES, the original power readings were done with a power meter head that is supposed to be water cooled, but currently isn't.   The readings from yesterday matched very closely the power out of the PMC that was measured with the water cooled beam dump, and were consistent when running the power to max and min at the bottom periscope.  The plan for today was to use the air-cooled power meter head that can go to 50W, that we borrowed from TCS (TVo),  to verify power at the bottom periscope mirror and the PMC.