Ops Shift Log: 11/21/2018, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for Vent
Intent Bit: Maintenance
Support: N/A
Incoming Operator: N/A
Shift Summary: Happy Thanksgiving
Activity Log: Time - UTC (PT)
14:20 (06:20) Peter – Into the PSL enclosure
15:45 (07:45) Karen & Vanessa – Into the LVEA for cleaning
16:00 (08:00) Start of Shift
16:10 (08:10) Ed – Going to HAM1 for electrical work
16:13 (08:13) Hugh – Going to HAM1 for HEPI work
16:39 (08:39) Hugh – Out of the LVEA – HAM1 HEPI is unlocked
16:45 (80:45) Peter – Out of the PSL enclosure
16:57 (08:57) Chandra & Kyle – Leak checking at HAM1
17:01 (09:01) Karen – Finished in the LVEA
17:02 (09:02) Vanessa – Going to End-X for cleaning
17:11 (09:11) Betsy & Daniel – Going into the LVEA
17:25 (09:25) Corey – Connecting HAM1 IO table light pipes
17:26 (09:26) TVo – Going into LVEA to recover CO2 lasers
17:33 (09:33) TVo – Out of the LVEA
17:50 (09:50) Richard – Going to HAM1 for electrical connections
17:56 (09:56) Chris – Taking parts to Kyle for leak checking
17:59 (09:59) TVo & TJ – Going into the LVEA to turn on CO2 lasers
18:00 (10:00) Daniel – Out of the LVEA
18:04 (10:04) Chris – Going to Mid-Y to look for equipment
18:14 (10:14) Corey – Out of the LVEA
18:18 (10:18) Chris – Back from Mid-Y
18:19 (10:19) Gerardo – Going to End-Y to recover vacuum equipment
18:53 (10:53) Gerardo – Back from End-Y
20:28 (12:28) Peter, Ed, & Richard – Going to the LVEA to check status of IFO for laser transition
21:00 (13:00) Peter, Ed, & Richard – Out of the LVEA
23:03 (15:03) Chandra & Kyle – Into the LVEA of IP2 work
00:00 (16:00) End of Shift